Home > What's New > Latest

Two roads opened to traffic

By | nxiang.net| Updated:  Aug 08,2022 L M S
In order to speed up the construction of Jinzhou New Town, Chuncheng North Road and Shengli East Road have been successfully completed, which will certainly help improve people's well-being.


The two-way six-lane Chuncheng North Road of high-speed railway new town area starts from in the north and Bajiawan Road in the south, with a total length of 382 meters and a width of 36 meters.

The Shengli East Road construction project is also located in the high-speed railway new town area. It starts from the planned Chunfeng Road in the west, connects with the planned Kangning Road and Fengxiang Road in the east, and ends at the planned Chuncheng North Road.


The width of the road including the inbound ramp is 30 meters, and the width of the road without the inbound ramp is 24 meters. It is an urban secondary trunk road paved with asphalt concrete.

The two roads will further improve the infrastructure of the high-speed rail new city area, play a positive role in promoting the economic development along the area, and enhance the popularity and development level of the area.